日本中文字幕在线观看_日产久久视频

China National Theatre for Children
DATE:17 Nov 2017 阅读次数:1
+ . -

Project site: Dongcheng District, BeijingConstruction area: about 6000 square metersCompletion time: 2003Both the remodeling of facade and the ingenious combination of acoustics and aesthetics of internal auditorium have won good social repercussions. The two-way curved heavy ceiling is adopted for the top of auditorium, which can not only diffuse the sound, but also hide the lighting gallery. The side wall combines the sound absorber and sound reflection body to form a highly rhythmical wall, which creates good acoustic effect while bringing pleasant visual enjoyment to people.